Heidemann/Baumgardner Home

Blog Archive

  • ▼  2008 (61)
    • ►  February (4)
    • ▼  March (15)
      • Basement Digout
      • A large lot, but still no space. Joe had Tony bui...
      • No job goes without its problems. The first one i...
      • Thursday, with the basement dig out complete, Joe ...
      • Garage Footings Trench
      • Utility Trench
      • Cline Construction started forming up the footings...
      • Kane
      • First Inspection
      • Footings Pour
      • Stripping forms today. Early knock off today, I h...
      • Rebar Time
      • Forming Foundation and Basement
      • Temp Power Pole
      • Foundation Pour
    • ►  April (9)
    • ►  May (14)
    • ►  June (7)
    • ►  July (1)
    • ►  August (1)
    • ►  September (1)
    • ►  October (5)
    • ►  November (3)
    • ►  December (1)
  • ►  2009 (12)
    • ►  January (4)
    • ►  February (2)
    • ►  August (4)
    • ►  September (2)
  • ►  2010 (1)
    • ►  October (1)

About Me

HB Home Site
View my complete profile

Friday, March 7, 2008

Utility Trench



A trench was dug between the house and the road along the north side of the driveway for drainage, water, power, telephone and cable tv. It took a bit of trying to get PUD to deliver the power cable, so Joe finally picked it up. We were also worried about the water connection. The meter was on the other side of the property in the southwest corner. Got lucky and found another access near the power hookup.
Posted by HB Home Site at 4:54 PM