Wednesday, March 12, 2008

First Inspection


Need to introduce the concrete group. Kory Cline, the boss is center left. With Chris on the left, Jeremy center right, and "Bills" on the right. Kane wasn't available to be in this picture.

Today we passed the first county inspection: the Footing and Building Site Inspection. The footing step downs weren't complete, so the inspector requested that when they were done that we take pictures of them for documentation. Also, the southwest corner of the garage was 6" to close to the drain field, but got lucky and he let it pass.

Knocked off early today, Kory had another pour to do, and wanted to take advantage of the good weather.