Started installing the rebar verticals, and spreder cleats for the forms. The rebar will be 16" on center, both vertical and horizontal. A lot of metal.
While snapping the form walls, Kory discovered there was a misalignment. We need to add a 1/2 yard of concrete to straighten it out.