Heidemann/Baumgardner Home

Blog Archive

  • ▼  2008 (61)
    • ►  February (4)
    • ▼  March (15)
      • Basement Digout
      • A large lot, but still no space. Joe had Tony bui...
      • No job goes without its problems. The first one i...
      • Thursday, with the basement dig out complete, Joe ...
      • Garage Footings Trench
      • Utility Trench
      • Cline Construction started forming up the footings...
      • Kane
      • First Inspection
      • Footings Pour
      • Stripping forms today. Early knock off today, I h...
      • Rebar Time
      • Forming Foundation and Basement
      • Temp Power Pole
      • Foundation Pour
    • ►  April (9)
    • ►  May (14)
    • ►  June (7)
    • ►  July (1)
    • ►  August (1)
    • ►  September (1)
    • ►  October (5)
    • ►  November (3)
    • ►  December (1)
  • ►  2009 (12)
    • ►  January (4)
    • ►  February (2)
    • ►  August (4)
    • ►  September (2)
  • ►  2010 (1)
    • ►  October (1)

About Me

HB Home Site
View my complete profile

Monday, March 17, 2008

Rebar Time



Started installing the rebar verticals, and spreder cleats for the forms. The rebar will be 16" on center, both vertical and horizontal. A lot of metal.

While snapping the form walls, Kory discovered there was a misalignment. We need to add a 1/2 yard of concrete to straighten it out.
Posted by HB Home Site at 3:32 PM