Wednesday, August 12, 2009
Start of House Tour
Start with the entry way. We don't use it yet. The steps will be installed when we do the driveway. Inside the entry, for the flooring we used black slate tile. The first photo was taken before the door hardware and stair railing was put in. But it shows very well the layout of in entry.
Start of Landscaping
The next major project is the landscaping. We have a year (from May) to finish it, but we had to rough-in the irrigation system so we can pour the driveway. So mind the ditches until we get it covered back in.
Yes Mary, Lyle did work while he was here. Maybe not that hard this day. I think he was really playing here.
The Garage
Outside Painting is Done
Subscribe to:
Posts (Atom)